KEGIATAN: PEMBANGUNAN GEDUNG GEREJA KUASI PAROKI GEREJA ST. GREGRORIUS AGUNG JAMBI |
|||||
PEKERJAAN: PEMBANGUNAN GEDUNG PASTURAN GEREJA ST. GREGRORIUS AGUNG JAMBI |
|||||
LOKASI: KOTA JAMBI |
|||||
TAHUN ANGGARAN : 2015 |
|||||
NO. |
URAIAN PEKERJAAN |
VOLUME SATUAN |
H. SATUAN |
JML HARGA |
|
Rp. |
Rp. |
||||
1 |
|
3 |
4 |
5 |
|
A |
PEKERJAAN PENDAHULUAN |
||||
I. |
PEKERJAAN PENDAHULUAN |
|
|
|
|
1 |
Pek. Air Kerja |
1.000 |
Ls |
400,000.00 |
400,000.00 |
2 |
Pek. Barak Kerja |
1.000 |
Ls |
1,000,000.00 |
1,000,000.00 |
|
JUMLAH |
1,400,000.00 |
|||
Sub Jumlah A |
1,400,000.00 |
||||
B. |
PEKERJAAN PONDASI DAN BETON STRUKTUR |
||||
I. |
PEKERJAAN TANAH DAN PASIR |
|
|
|
|
1 |
Pek. Galian Tanah Pondasi Pelat Setempat |
117.37 |
M3 |
78,125.00 |
9,169,531.25 |
2 |
Pek. Urugan Tanah |
504.78 |
M3 |
151,250.00 |
76,347,370.00 |
3 |
Pek. Urugan Pasir dibawah Pondasi |
4.10 |
M3 |
121,250.00 |
497,610.00 |
4 |
Pek. Urugan Pasir Lt.Dasar & dibawah Sloof T.5 cm |
28.75 |
M3 |
121,250.00 |
3,486,240.63 |
|
JUMLAH |
89,500,751.88 |
|||
II. |
P. PONDASI DAN BETON STRUKTUR LANTAI DASAR |
|
|
|
|
1 |
Pek. Pondasi Uk. 1 x 1 M |
19.40 |
M3 |
3,102,190.00 |
60,194,894.76 |
1 |
Pek. Pondasi Uk. 0,4x0,4 M |
0.10 |
M3 |
3,102,190.00 |
297,810.24 |
2 |
Pek. Pondasi Uk. 0,6x0,6 M |
0.43 |
M3 |
3,102,190.00 |
1,340,146.08 |
3 |
Pek. Sloof Beton /Besi 145 kg |
5.01 |
M3 |
3,171,165.00 |
15,887,536.65 |
4 |
Pek. Kolom Beton /Besi 175 kg |
38.16 |
M3 |
4,362,765.00 |
166,483,112.40 |
5 |
Pek. Balok Beton /Besi bertulang (190 kg besi + bekisting) |
7.62 |
M3 |
4,579,640.00 |
34,896,856.80 |
6 |
Pek. kolom praktis beton bertulang ( 11 x 11 ) cm |
126.00 |
M' |
67,785.00 |
8,540,910.00 |
7 |
Pek. Pelat beton bertulang T. 12 cm |
49.000 |
M3 |
4,579,640.00 |
224,402,360.00 |
8 |
Pek. Cerucup Kayu Bulat Dia 10 - 15 Cm Panjang 3 - 4 M / Btg |
50.00 |
Btg |
37,550.00 |
1,877,500.00 |
9 |
Pek. Lantai Kerja T. 5cm dibawah Pondasi Pelat |
4.10 |
M3 |
627,495.00 |
2,575,239.48 |
10 |
Pek. Lantai Kerja T. 5cm Lt.Dasar |
27.50 |
M3 |
627,495.00 |
17,256,112.50 |
11 |
Pek. Lantai Kerja T. 5cm dibawah Balok Sloof |
1.25 |
M3 |
627,495.00 |
785,937.49 |
12 |
Pek. Pondasi Batu Bata / Dinding Penahan Tanah |
11.69 |
M3 |
94,360.00 |
1,103,068.40 |
|
JUMLAH |
535,641,484.80 |
|||
Sub Jumlah B |
625,142,236.67 |
||||
|
|
|
|
|
|
C. |
PEKERJAAN PLAFONG, TANGGA, PENGECATAN NON STRUKTUR |
||||
I. |
PEKERJAAN PLAFON |
|
|
|
|
1 |
Pek. Plafond GRC |
1,044.16 |
M2 |
53,475.00 |
55,836,562.95 |
2 |
Pek. Rangka Plafond |
1,044.16 |
M2 |
56,737.50 |
59,243,141.48 |
3 |
Pek. List Profil |
73.60 |
M1 |
28,150.00 |
2,071,840.00 |
|
JUMLAH |
117,151,544.43 |
|||
II. |
PEKERJAAN TANGGA |
|
|
|
|
1 |
Pek. Beton Site Mix 1:2:3 Balok Bordes Uk. 20/30 Cm |
0.360 |
M3 |
4,579,640.00 |
1,648,670.40 |
2 |
Pek. Beton Site Mix 1:2:3 Plat Bordes |
1.440 |
M3 |
4,436,390.00 |
6,388,401.60 |
3 |
Pek. Beton Site Mix 1:2:3 Plat Anak Tangga |
12.600 |
M3 |
4,436,390.00 |
55,898,514.00 |
|
JUMLAH |
63,935,586.00 |
|||
III. |
P. NON STRUKTUR, PASANGAN DAN PLASTERAN |
|
|
|
|
1 |
Pek. Pas. Dinding Bata Tebal 1/2 Bata ad. 1 : 4 |
####### |
M2 |
94,360.00 |
130,443,264.00 |
2 |
Pek. Acian Plasteran Dinding |
####### |
M2 |
39,355.00 |
101,630,352.00 |
2 |
Pek. Plesteran Dinding t. 1,5 Cm ad. 1 : 4 |
####### |
M2 |
62,661.60 |
161,817,315.84 |
3 |
Pek. Lantai Keramik |
950.000 |
M2 |
195,502.40 |
185,727,280.00 |
4 |
Pek. Kran air 1/2 ", 3/4" |
14.000 |
Bh |
26,000.00 |
364,000.00 |
5 |
Pek. Pipa PVC 1/2", 3/4 " |
40.000 |
M1 |
14,505.09 |
580,203.75 |
|
JUMLAH |
580,562,415.59 |
|||
IV. |
PEKERJAAN PENGECATAN |
|
|
|
|
1 |
Pek. Cat Dinding |
####### |
M2 |
25,430.00 |
65,670,432.00 |
2 |
Pek. Cat Kayu Pintu dan Jendela |
60.000 |
M2 |
37,852.50 |
2,271,150.00 |
3 |
Pek. Cat Plafond dan List |
####### |
M2 |
25,430.00 |
28,424,687.66 |
|
JUMLAH |
96,366,269.66 |
|||
Sub Jumlah C |
858,015,815.68 |
||||
D. |
PEKERJAAN KUSEN, PINTU, DAN JENDELA |
||||
I |
PEKERJAAN PINTU JENDELA |
|
|
|
|
1 |
Pek. Kusen Pintu |
1.958 |
M3 |
7,023,750.00 |
13,755,312.00 |
2 |
Pek. Kusen Jendela |
1.958 |
M3 |
7,023,750.00 |
13,755,312.00 |
3 |
Pek. Kusen Pintu KM/WC |
1.958 |
M3 |
7,023,750.00 |
13,755,312.00 |
4 |
Pek. Pintu Panel |
1.800 |
M2 |
686,250.00 |
1,235,250.00 |
5 |
Pek. Jendela Kaca |
165.240 |
M2 |
556,725.00 |
91,993,239.00 |
6 |
Pek. Kunci Tanam |
42.000 |
Bh |
158,875.00 |
6,672,750.00 |
7 |
Pek. Kunci Tanam Antik |
8.000 |
Bh |
188,875.00 |
1,511,000.00 |
8 |
Pek. Engsel Pintu |
102.000 |
Bh |
36,068.75 |
3,679,012.50 |
9 |
Pek. Engsel Jendela |
68.000 |
Bh |
19,312.50 |
1,313,250.00 |
10 |
Pek. Hak Angin |
68.000 |
Bh |
28,593.75 |
1,944,375.00 |
11 |
Pek. Tarikan Jendela |
34.000 |
Bh |
23,393.75 |
795,387.50 |
12 |
Pek. Pintu KM?WC |
15.360 |
M2 |
686,250.00 |
10,540,800.00 |
|
JUMLAH |
160,951,000.00 |
|||
Sub Jumlah D |
160,951,000.00 |
||||
E. |
PEKERJAAN ATAP |
||||
I |
PEKERJAAN RANGKA DAN PENUTUP ATAP |
|
|
|
|
1 |
Pek. Rangka Atap Baja Ringan |
952.000 |
M2 |
274,750.00 |
261,562,000.00 |
2 |
Pek. Penutup Atap |
952.000 |
M2 |
77,930.00 |
74,189,360.00 |
|
JUMLAH |
335,751,360.00 |
|||
Sub Jumlah E |
335,751,360.00 |
||||
F. |
PEKERJAAN LISTRIK |
||||
I |
PEKERJAAN INSTALASI DAN LAMPU |
|
|
|
|
1 |
Pek. Instalasi Listrik dan Sambungan PLN |
1.000 |
Ls |
5,000,000.00 |
5,000,000.00 |
2 |
Lampu TL 20 watt |
25.00 |
Set |
35,000.00 |
875,000.00 |
3 |
Lampu XL 40 Watt |
25.00 |
Bh |
58,000.00 |
1,450,000.00 |
4 |
Lampu XL 10 Watt |
5.00 |
Bh |
35,000.00 |
175,000.00 |
5 |
Pek. Stop Kontak |
20.00 |
Bh |
17,850.00 |
357,000.00 |
6 |
Pek. Saklar Ganda |
25.00 |
Bh |
22,000.00 |
550,000.00 |
7 |
Pek. Saklar Tunggal |
25.00 |
Bh |
17,850.00 |
446,250.00 |
8 |
Pek. MCB + Box Sekring |
2.00 |
Bh |
75,000.00 |
150,000.00 |
|
|
|
|
JUMLAH |
9,003,250.00 |
Sub Jumlah F |
9,003,250.00 |
||||
G. |
PEKERJAAN SANITASI |
||||
I |
PEKERJAAN SEPTICTANK |
|
|
|
|
1 |
Pek. Septic Tank |
1.000 |
Ls |
5,000,000.00 |
5,000,000.00 |
2 |
Pek. Pipa PVC 3", 4 " |
25.00 |
M1 |
60,154.84 |
1,503,871.09 |
3 |
Pek. Saluran Air hujan Pipa PVC 3" |
70.00 |
M1 |
46,268.59 |
3,238,801.56 |
|
|
|
|
JUMLAH |
9,742,672.66 |
Sub Jumlah G |
9,742,672.66 |
||||
Total |
2,000,006,335.00 |
Pembangunan Gedung Pastoran Gereja Santo Gregorius Agung Jambi
"Guru, betapa bahagianya kami berada di tempat ini. Baiklah kami dirikan sekarang tiga kemah, satu untuk Engkau, satu untuk Musa, dan satu untuk Elia". (Mrk 9:5)
Selasa, 30 Juni 2015
Rencana Anggaran Belanja
Berikut ini Rencana Anggaran Belanja untuk pembangunan gedung pastoran Gereja Gregorius Agung Jambi.
Langganan:
Posting Komentar (Atom)
Tidak ada komentar:
Posting Komentar